Edmunds Answers

Answers

  • MrShift@Edmunds 07/26/09 12:30 am PST

    About 4 hours labor:

    REMOVAL

    1. Negative battery cable.
    2. A/C compressor splash shield.
    3. Drain cooling system.
    4. Supercharger drive belt.
    5. Drive belt.
    6. Position coil pack out of the way.
    7. Supercharger belt tensioner.
    8. Engine support fixture.
    9. Engine mount.
    10. Power steering pump.
    11. Engine mount bracket.
    12. Idler pulley.
    13. Water pump pulley.
    14. Water pump. Clean all gasket mating surfaces.


ADVERTISEMENT

Top Heating / Cooling Experts View More

Rank Leader Points
1. karjunkie 7445
2. MrShift@Edmunds 6465
3. docj 2210
4. zaken1 1885
5. tony78 1365
6. 0patience 1140
7. texases 1030
ADVERTISEMENT